  Adsun in its short term has activated many milestone of successfully completing the project within the time limit or before the schedule provided, thus, saving cost's for the client.
 
 
The major milestone achieved by Adsun is as follows:-
Freespan Correction of 24" LA-LFP Subsea Pipeline Canbay West Coast - India.
SPM 2 Change Out including Chain Tensioning, Removal and Re-Installation of Sub Sea Hoses, Removal and Reinstallation PLEM Valve Actuators, Hydro Testing of Entire System and Rotation Checks of Turn Table under pressure. Reliance -Jamnagar
Base Line Platform Inspection of GA Platforms Using ACFM Technique, installation Conductor Guide Frames Including Free Span Corrections
Dive support for pipelying and subsea tie-in with Punjj Lloyds for ONGCL at Mumbai harbor.
Dive support for pipelying and subsea tie-in with Covus for ONGCL at East coast (Kakinada)
Installation of A-2 well platform and 2 X 12" pipelay from platform to shore with Clough for Niko Resources at Hazira Offshore.
Platform inspection (MPI of weld subsea weld joints for Reliance Refinery Terminal at Jamnagar.
Platform / Riser Inspection, Well-head inspection and Pipeline route survey for fugro at G-15 platform at east coast (Kakinada)
Fiber Optic cable laying project with Mastertech / Global marine for Reliance at Mumbai (Versova)
Success fully completing removal and installation of diffuser of pipeline for BMC at Mumbai.
Placement of current meter with Fugro for ONGCL at Mumbai
  And many more..
 
     
 
 